Lisbon · Setúbal · Algarve · Porto
Solar panels in Portugal
A licensed installer with a free roof survey and a written, itemised quote at a fixed price. Home systems, batteries, business roofs and EV chargers, all declared to DGEG and explained in plain English.
- Licensed electrical installer, every system declared to DGEG
- Free roof survey and an itemised fixed-price quote
Solutions
Solar for your home, your business and your car
We start with a free roof survey, design the system on your real roof and your real bills, and give you an itemised written quote at a fixed price. These are the projects we install most often.
Solar panels for your home
A roof system sized to your consumption, with panels, inverter, mounting, cabling, monitoring and the declaration to DGEG. Most homes need between 3 and 7 kWp.
Battery storage
A home battery keeps your midday surplus for the evening, so you buy less from the grid. It can be installed with a new system or added to an existing one, and we show the numbers with and without it.
Business and farm roofs
For shops, offices, warehouses, farms and hotels that use power in the daytime. We read your bills, design to your load and handle the registration that systems above 30 kW require.
EV charger with solar
A 7.4 kW home charger installed on a dedicated circuit and set to use your solar surplus when the sun is out. It can be added to any of our packages.
Packages
Choose a system size, then add a battery if it fits
The right size depends on your annual consumption and your roof. Prices below are starting prices with 23% VAT included, and the final price is in your written quote.
Starter, 3 kWp
About 7 panels. A good fit for a small home, a flat or a holiday home that uses power in the daytime. It typically produces about 4,700 kWh a year in Lisbon.
Family, 5 kWp
About 11 panels. The most common size for a family home. It typically produces about 7,900 kWh a year in Lisbon, enough to cover a large share of a household’s needs.
Large home, 7 kWp
About 16 panels. For a large villa with a pool, air conditioning, a heat pump or an electric car. It typically produces about 11,000 kWh a year in Lisbon.
Battery add-on
A 5 kWh or 10 kWh battery with a hybrid inverter, added to any package. It gives you power in the evening and, if designed for it, backup for selected circuits during an outage.
Solar guide
Solar panels in Portugal: what to know before you buy
Is solar worth it in Portugal?
Portugal is one of the sunniest countries in Europe, and self-consumption has grown fast. The national regulator, ERSE, reported about 237,000 self-consumers and 1.8 GW of installed self-consumption capacity at the end of 2024, with the number of systems growing by about 44% a year since 2021. According to REN data reported by pv magazine, solar supplied about 19% of the country’s electricity consumption in July 2026, when it was the largest source for the first time.
For a household, the question is how much of the electricity you use while the sun is out. The more you use directly, the better the return, because power you use yourself saves you the full retail price, while surplus you export is paid much less. The European Commission’s PVGIS tool estimates about 1,580 kWh per year for each kWp of panels in Lisbon, 1,510 in Porto and 1,750 in the Algarve, at the best tilt and facing south. A 5 kWp system in Lisbon would therefore produce about 7,900 kWh a year.
How a project works
- Survey. We study your bills, your roof, the shading and your fuse board, usually in one visit and always free.
- Design and quote. We model the production on your roof and give you an itemised written quote with the price, the expected output and the assumptions.
- Filing. After you accept, we make the prior communication to the authorities and any grid operator notice the power requires.
- Installation. Our technicians fit the panels, inverter and cabling, which usually takes one or two days on site.
- Commissioning. We test the system, set up the monitoring app and declare the installation on the DGEG platform.
From the survey to a working system, three to six weeks is typical, and the time is mostly spent on the filing and on the delivery of equipment. Installers publish timings between two and eight weeks, depending on the season and on the grid operator.
Permits and rules
Self-consumption in Portugal is governed by Decreto-Lei 15/2022, which is built around the UPAC, the production unit for self-consumption. In its original text, a system of up to 700 W that does not export to the grid is exempt from prior control. A system above 700 W and up to 30 kW needs a prior communication, and the proof of submission is what allows you to install it. From 30 kW to 1 MW you need a prior registration and a certificate of operation, and above 1 MW or for non-renewable sources a production and operating licence.
The framework was amended in 2026. Decreto-Lei 130/2026 applies from 28 August 2026, and law firms and tax sites report that the exemption for very small systems without export rose from 700 W to 800 W. Law 29/2026, in force from 1 July 2026, also created a new regime for systems up to 1 MW with a term of up to 15 years. Procedures begun before the new dates keep the old rules. We confirm the current text for every project and handle the filings for you.
Under the original text, the grid operator, E-REDES on the mainland, is consulted only when the power you inject would exceed both 50% of your contracted power and 30 kVA on low voltage, and only while the annual injection quota is not used up. For most homes this means no wait for a grid study.
Costs and payback
Our fixed prices, with 23% VAT included, start at €4,900 for 3 kWp, €6,900 for 5 kWp and €9,400 for 7 kWp. A battery adds from €3,900 for 5 kWh and from €6,900 for 10 kWh, and an EV charger installed starts at €1,190. For comparison, Portuguese installers publish prices of about €4,000 to €5,000 for 3 kWp and €6,000 to €9,000 for 5 kWp in 2026, and about €3,500 to €4,500 for a 5 kWh battery. Shop kits sold online with a battery can look much cheaper because they are equipment only, without installation, design or the filings.
A worked example: a 5 kWp system in Lisbon produces about 7,900 kWh a year. If you use 60% directly at about €0.17 per kWh, you save about €800 a year, and the surplus sold at a low market-linked price adds roughly another €100. On a €6,900 price, that is a payback of about seven to eight years. A smaller share of daytime use makes it longer, and a higher electricity price makes it shorter. Installers’ claims of four-year paybacks are best treated with caution.
On incentives, the reduced 6% VAT rate on solar panels ran from July 2022 to June 2025 and was not renewed, and as far as we found, it has not come back. The Vale Eficiência household voucher programme is being wound down, and no household solar grant was open when we last checked in October 2026. There is no specific solar deduction in the personal income tax return. We do not rely on grants in our quotes, and we tell you if a notice opens.
Surplus and selling power
Portugal has no net-metering scheme that credits exported power against your bill. The surplus can be injected without payment or sold under a contract with an authorised buyer, at a price the buyer sets, which is generally well below the price you pay for electricity. ERSE data show that about 27% of the output of self-consumption systems was injected into the grid in 2024, and 43% of that was sold.
The practical rule is to size the system for your own consumption and to move your use into the daytime, for example by running the dishwasher, the heat pump or the car charger at midday. A battery stores some of the surplus for the evening. Income from selling surplus is reported to be excluded from income tax up to €1,000 a year for systems up to 1 MW, and we suggest you confirm this with your accountant.
Apartments and condominiums
A flat owner can install panels on a private terrace or balcony. For panels in a common area, the framework requires you to give the building administration at least 60 days’ notice. The administration has 20 days to object, and only on four grounds: the architecture of the building, a disproportionate restriction of other owners’ rights, blocked access and safety. An objection can be taken to the owners’ assembly, called within 30 days, and if the administration does not reply, the prior communication is sufficient. Tax and law sites report that since 1 July 2026 a collective system for the building can be approved by a simple majority of owners, which we check for each case.
Collective self-consumption is also possible, where a system supplies several consumption units, and renewable energy communities are recognised in the law. As a general rule, the production and the consumption must be close, within 2 km on low voltage or on the same transformer.
Who may install
A system above 700 W must be installed by a licensed installation entity for private electrical installations, or by a responsible technician for electrical installations, under Law 14/2015 and Decreto-Lei 96/2017. The installer must check that the system is exempt, registered or licensed, and must declare each system on the DGEG platform. The only exception is certified plug-and-play equipment under 1.5 kW. Our company is a licensed installation entity, and our responsible technician signs every project.
Ask any installer for the company’s recognition document and the technician’s number, and ask to see the declaration for a recent project. We could not find an official public list that you can search to check an installer, so asking for the documents is the practical test. Watch out for door-to-door sellers, pressure to sign on the day and requests for a cash deposit. If you sign a contract away from the seller’s premises, you normally have 14 days to withdraw, and a new product carries at least three years of legal guarantee in Portugal under consumer law.
Questions to ask any installer
- Are you a licensed installation entity, and what is the recognition number?
- Who is the responsible technician, and can I see the declaration for a recent project?
- Which panels, inverter and battery brands will you use, and what are their warranties?
- What is the expected annual output on my roof, and what assumptions does it use?
- What does the price include: the design, the filings, the monitoring, the scaffolding and the DGEG declaration?
- What happens if the inverter fails after the warranty, and who do I call?
This guide is general information and is not legal, tax or engineering advice. Rules change, and a survey of your roof and your bills is needed before any system is sized.
How it works
Three steps to a system that pays for itself
- Step 1
Send your bill and a photo of your roof
Tell us about your home and share a recent electricity bill. An engineer replies within one business day and books a free survey.
- Step 2
Receive an itemised quote
After the survey, you get a written quote with the system size, the expected output, the price and the payback, and every assumption written down.
- Step 3
Installation and DGEG declaration
We handle the filings and the installation, set up your monitoring and declare the system, so that you can start saving on your next bill.
Our experience
Recent installations
Anonymised projects, shared with the owners’ consent. Every roof is different, and these are examples, not promises.
6.6 kWp with a 10 kWh battery
A holiday home that is occupied for part of the year wanted low bills in summer and the pool pump running on solar. We fitted 15 panels on the south roof and a hybrid inverter with a battery, with remote monitoring for when the owner is abroad.
ResultCommissioned five weeks after the survey
48 kWp on a warehouse roof
A farm with cold storage and irrigation pumps used most of its power in the daytime. Because the system was above 30 kW, we handled the prior registration and the certificate of operation before switching it on.
ResultRegistration and certificate in place before activation
2.2 kWp on a private terrace
The owner of a top-floor flat wanted a small system on the terrace. The system was above 700 W, so we filed the prior communication, and the building administration received the 60-day notice and raised no objection.
ResultInstalled in one day, with the DGEG declaration filed
About us
Who is behind Solar Panels Portugal
We are a Lisbon installer founded in 2014 by Inês Vasconcelos, an electrical engineer. We built the company around two ideas: every customer gets a free survey and an itemised written quote at a fixed price, and every system is filed, tested and declared properly. Our technicians are employees, not subcontractors, and we work in English, Portuguese, French and German.
- Inês VasconcelosFounder and managing engineer
Electrical engineer · Ordem dos Engenheiros no. 00000 · 14 years in solar
- Tiago FerreiraLead engineer
Responsible technician for electrical installations · no. 00000 · 11 years of installations
- Carolina LopesCustomer manager
English, Portuguese, French and German
What customers say
The survey was free and the quote listed every item, with the expected output and the assumptions behind it. The price did not change, and the team handled the paperwork with the authorities.
Mark T. · Algarve · October 2026
They fitted the panels in two days and walked me through the app. In the first summer month our bill was a fraction of what it had been, and the engineer answered my questions in plain English.
Sabine K. · Setúbal · September 2026
I was told honestly that a battery would lengthen the payback for us, and I chose to wait. That honesty is why I trusted them with the whole project.
Rui P. · Lisbon · August 2026
Registrations and standards
Check us before you sign
Ask any installer for its recognition number and for the responsible technician’s number, and ask to see a recent DGEG declaration. Every installer should be able to show them.
- Licensed installation entityRecognition no. 00000, with a responsible technician for every project
- Built on ERSE dataWe use the regulator’s tariffs and self-consumption reports in our calculations
- Insurance and warrantyCivil liability cover and a 10-year warranty on our workmanship
- Customer reviewsGoogle 4.8 · 187 reviews
Official sources we rely on
- Decreto-Lei 15/2022, the electricity system and self-consumption framework (Diário da República)
- CMS, changes to the UPAC regime under Lei 29/2026
- ERSE, 2024 electricity self-consumption report
- European Commission, PVGIS solar energy estimates
- pv magazine, solar in Portugal in August 2026
- Observador, end of the reduced VAT rate on solar panels
- DECO PROTESTE, end of the Vale Eficiência programme
- Livro de Reclamações, the official electronic complaints book
- Last reviewed 28 October 2026 by Inês Vasconcelos, electrical engineer
If something goes wrong
Tell us first, and the managing engineer will answer. You can also file a complaint in the electronic complaints book at livroreclamacoes.pt, whatever your nationality or residence, and consumer associations such as DECO PROTESTE give advice on contracts and guarantees.
What your quote includes
- Roof survey and system designincluded
- Itemised written quote and priceincluded
- Panels, inverter, mounting and cablingincluded
- Installation by licensed techniciansincluded
- Prior communication and DGEG declarationincluded
- Monitoring app and handover fileincluded
- Scaffolding above two floorsextra
- Roof repairs and fuse board upgradesextra
Contact us
Open our office area in Google MapsQuestions before you go solar
How much do solar panels cost in Portugal?
Our fixed prices, with 23% VAT included, start at €4,900 for a 3 kWp system, €6,900 for 5 kWp and €9,400 for 7 kWp, and a battery adds from €3,900 for 5 kWh. Published prices from Portuguese installers in 2026 are in a similar range: about €4,000 to €5,000 for 3 kWp and €6,000 to €9,000 for 5 kWp, with a 5 kWh battery adding about €3,500 to €4,500. The final price depends on your roof, your inverter and the cable runs, so we give you an itemised written quote after the survey.
How much electricity will my panels produce?
It depends on where you live and how the roof faces. The European Commission’s PVGIS tool gives about 1,580 kWh per year for each kWp in Lisbon, 1,510 in Porto and 1,750 in the Algarve, for panels at the best tilt facing south. A 5 kWp system in Lisbon would therefore produce about 7,900 kWh a year. A roof facing east or west, or one with shade, produces less, and we model your own roof before we quote.
How long does it take to earn back the cost?
For a typical home, most sources give about seven to ten years, and that assumes you use a good share of the power yourself. A 5 kWp system in Lisbon that costs €6,900 and saves about €900 a year, from 60% direct use at about €0.17 per kWh plus a small payment for the surplus, pays back in roughly seven to eight years. Claims of a four-year payback usually assume a very high consumption or a large grant. We show your own calculation in the quote, with the assumptions written down.
Is there a grant or a lower VAT rate for solar panels?
As far as we found in October 2026, no household solar grant is open, and the reduced 6% VAT rate on panels, which applied from July 2022 to June 2025, was not renewed, so the standard 23% applies. Government programmes change often, so we check the current notices for every customer, and we never base a quote on a grant that is not open. There is also no specific solar deduction in the personal income tax return.
Do I need a licence or permission to install panels?
For a self-consumption system, the rules depend on the power. In the original 2022 framework, a very small system of up to 700 W with no export to the grid needed no prior control, a system from 700 W to 30 kW needed a prior communication to the authorities, one from 30 kW to 1 MW needed a prior registration and a certificate of operation, and anything bigger needed a licence. A 2026 amendment applies from 28 August 2026, and law firms report that it raises the small-system limit to 800 W. We handle the filings and confirm the current text for your project.
Can I sell the extra electricity?
Yes, but not at the price you pay. Surplus power can be injected without payment, or sold under a contract with an authorised buyer, at a price the buyer sets and that is generally well below what you pay for electricity. Portugal has no net-metering scheme that credits surplus against your bill, so a system sized for your own consumption gives the best return. Income from selling surplus is reported to be exempt from income tax up to €1,000 a year, which we recommend you confirm with your accountant.
Is a battery worth it?
A battery stores the midday surplus for the evening, so you buy less from the grid and rely less on poorly paid exports. It adds about €700 to €1,100 per kWh installed, so it lengthens the payback of the system, and many households with low daytime use or an EV and a heat pump get the most from it. It also keeps selected circuits running during an outage if the system is designed for that. We show the system with and without a battery so you can compare.
Can I install solar in an apartment?
Yes, in many cases. You can install panels on a terrace or balcony that belongs to you, and for panels in a common area the framework requires you to notify the building administration at least 60 days beforehand. The administration then has 20 days to object, and only on four grounds: the architecture of the building, disproportionate restriction of other owners’ rights, blocked access and safety. An objection can be taken to the owners’ assembly, and if the administration does not reply, the prior communication is enough. A shared system for the whole building may now need only a simple majority, which we confirm for your case.
How do I check that an installer is qualified?
In Portugal, a system above 700 W must be installed by a licensed installation entity or by a responsible technician for electrical installations, and the installer must declare each system on the DGEG platform. Ask for the company’s recognition document and the technician’s number, and ask to see the declaration for a recent project. A plug-and-play kit under 1.5 kW is the only exception. Be careful with a door-to-door salesperson who asks for a cash deposit or pressures you to sign on the day.
What happens after the installation, and how long are the warranties?
We commission the system, show you the monitoring app and give you the technical file, the DGEG declaration and the warranty documents. Manufacturers typically guarantee panel output for 25 years at no less than about 80% of the original, with product warranties of 10 to 12 years. Inverters usually carry 5 to 10 years and can be extended, and we give 10 years on our workmanship. Panels last 25 to 30 years and inverters 10 to 15 years, so plan for one inverter replacement in the life of the system.